Archives
Below is a list of the documents from each round of GMA 13 planning cycles dating back to 2010.Â
Round 1:
Desired Future Conditions Submittal
Modeled Available Groundwater
Round 2:
Adopted Desired Future Conditions (11/21/2016)
Desired Future Conditions Submittal
Modeled Available Groundwater
Round 3:
Adopted Desired Future Conditions (11/19/2021)
Desired Future Conditions Submittal
Modeled Available Groundwater